
Coordinate electrical and structural design
Socket, lighting, distribution board and cable routes should be coordinated with the architecture and structure before construction.
Approved design and applicable rules
New installations should follow approved permit drawings, authorised design decisions and applicable electrical requirements.
Boards, protection and automation
Clear labelling, circuit separation, earthing, residual-current and surge protection support safe operation. Data, security and home automation routes should be planned during construction.
Technical service
Fault finding starts with measurement and diagnosis. Board checks, repairs and system tests are then documented according to the agreed scope.
Costs depend on land, access, dimensions, materials, labour, transport, design and scope. Send the location and photographs or call +90 537 437 7635.